Dry Verge Unit Right Hand - Brown
In stock
Only %1 left
Code
GDV-RH-BR
Code | GDV-RH-BR |
---|
Each Dry verge unit clips onto the tail fins of the previous unit to ensure that it is correctly located.
The dry verge unit is nailed into the tile batten through one of the holes in the tail of the unit.
Dry verge units are handed. Most orders are comprised of an equal number of left and right units, but for the sake of clarity the handing of Manthorpe dry verge units is shown below;